You are accessing the Global Goodman site. Are you looking for your local Goodman site?
This is content entry and needs to be updated to CN
Would you like to be redirected to the English site?

Gallery

Goodman Westlink

Features

Contact

Goodman Westlink

Tuen Mun Town Lot No.544 on Siu Lang Shui Road, Area 49,Hong Kong,China

SIze Total size: 139,355 sqm
Type Property type: Under construction

Scheduled to complete in Q1 2022, Goodman Westlink will be the state-of-art logistics facility with full ramp access suitable for the newest advancements in automation and robotics.

24-7 operations 24-7 operations
Café Café
Parking Parking
CCTV surveillance CCTV surveillance
Convenience store Convenience store
ESFR sprinklers ESFR sprinklers
Security Security
Shuttle bus Shuttle bus
Truck parking Truck parking

 

  • Leasable area of 1.5 million sq ft (approx. 400,000 sq ft per floor) 
  • storey modern logistics building with direct ramp access to all floors
  • Energy efficient design targeting LEED certification
  • Amenities such as cafeteria, convenience store and outdoor roof garden shall be available and shuttle bus service to be provided
  • Abundant parking and loading and unloading bays to support high volume of vehicle movements
  • 5 metres clear ceiling height with floor loading capacity of 17.5 kPa

Enquire about this property

Location

Location

Goodman Westlink will be linked to the Hong Kong International Airport via the Tuen Mun-Chek Lap Kok Tunnel within a 20-minute travel time.

Please select amenity  

 

See routes

Consumer reach within 20 km

Source: Esri and Michael Bauer Research

Availability

Explore other properties